View Single Post
  #2  
Unread 11-28-02, 09:26 AM
stackj stackj is offline
Registered User
 
Join Date: Apr 2002
Location: Richmond, VA
Posts: 311
stackj is an unknown quantity at this point
Send a message via AIM to stackj
Plesant Surprise

The facia over the switch sub-panel is reasonably flexible. I was able to do the job in less than two hours. That's less than 30 minutes per switch replaced (2 Boost pumps, Regulator selector and Run Stby).

Now if I can just find a Master Sw (S1159-1-1) and a Generator Sw (S1160-2-1) I might also get rid of the fluctuating voltage in the electrical system.
__________________
Jim Stack
Richmond, VA
Reply With Quote