I'm planning on installing a new Aspen glass panel in my T337GP and I started looking around for install estimates. The first estimate I got was 93 hours for the install

Any pireps out there for install times in the Skymaster? I've seen 20-30hours in other forums so I just can't believe it's over 3 times the average for other aircraft. The PFD1000 is selling for $7995 until November 30th so I think that's a pretty good deal. However, paying $9300 for the install of something that is advertised as an easier install than a G500 sounds crazy.
Granted I have a 430W, GTX 345, STEC 30 ALT and EDM 760 to connect to, but he didn't even ask me about those systems. It was strictly based off of being a Skymaster.
Thanks in advance!
Scott
N84E