Skymaster Forum  

Go Back   Skymaster Forum > Messages
Register FAQ Members List Calendar Today's Posts

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Unread 10-06-09, 09:21 PM
Todd Gessel's Avatar
Todd Gessel Todd Gessel is offline
Registered User
 
Join Date: Jan 2009
Location: Arizona
Posts: 36
Todd Gessel is on a distinguished road
New Engine

I'm putting in a new re manufactured rear engine from Air Power. While I'm at it, it's getting new hoses, new vac pump, new Lord mounts, F-M enterprises oil filter adapter, new drain plug, neoprene valve cover gaskets, new baffling, new prop and governor. The exhaust system and engine mount has been visually inspected. This airplane has about 800 total hours on it.

Does anyone have any advice or comment about anything else that should be considered, inspected or done while I have the rear engine out? Is there any potential SID inspections or tests I could or should do with the engine out?

If anyone is interested, I gave $29,625.00 for the engine, $1,012.00 for freight (round trip), $12,100.00 core deposit, $695.92 for (4) Lord mounts, and $354.64 for the vacuum pump.

Thanks, I really appreciate everyone's participation in this great resource for Skymaster enthusiast.
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 07:05 PM.


Powered by vBulletin® Version 3.6.9
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.