![]() |
|
Register | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
![]() |
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
To state the obvious even more. Check hydraulic fluid level and be sure the system is adequately purged of air. I was surprised how many cycles we had to do on the jacks to get the air out of the system. And how much more fluid it took after each purging attempt.
|
#2
|
||||
|
||||
Attached is another way from service manual to purge air from system without placing on jacks.
5-128. BLEEDING TIME-DELAY VALVE. The Time-delay valve in the Power Pack may be purged of air by operating the engine-driven pump, or the Hydro Test may be used. 2. Make sure reservoir is full. b Start engine and let run at 1000 rpm, or connegt Hydro Test in accordance with paragraph 5-125 Place landing gear handle in the down position and hold for approximately one minute, while turning the master switch OFF until doors open, then ON un- til doors close. d. Repeat step "c" four times, waiting one minute between steps. e. Check that time-delay operates properly by mov- ing gear handle sharply to the down position and re- cording time as handle returns to neutral. NOTE The time delay between closing of the landing gear doors and releasing the landing gear handle to neutral should be between 3 and 9 seconds at room temperature. Colder temper- atures will cause a longer delay. i. Shut down engine, or disconnect Hydro Test in accordance with paragraph 5-126. https://ibb.co/P9P0bQ9
__________________
337B Philadelphia PA |
![]() |
Thread Tools | |
Display Modes | Rate This Thread |
|
|