Skymaster Forum  

Go Back   Skymaster Forum > Messages
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Rate Thread Display Modes
  #1  
Unread 02-28-22, 08:17 PM
Jhogan0101's Avatar
Jhogan0101 Jhogan0101 is offline
Registered User
 
Join Date: Mar 2019
Location: Philadelphia
Posts: 191
Jhogan0101 is on a distinguished road
Attached is another way from service manual to purge air from system without placing on jacks.

5-128. BLEEDING TIME-DELAY VALVE.
The
Time-delay valve in the Power Pack may be purged of
air by operating the engine-driven pump, or the
Hydro Test may be used.
2.
Make sure reservoir is full.
b
Start engine and let run at 1000 rpm, or connegt
Hydro Test in accordance with paragraph 5-125
Place landing gear handle in the down position
and hold for approximately one minute, while turning
the master switch OFF
until doors open,
then ON un-
til doors close.
d.
Repeat step "c" four times, waiting one minute
between steps.
e.
Check that time-delay operates properly by mov-
ing gear handle sharply to the down position and re-
cording time as handle returns to neutral.
NOTE
The time delay between closing of the landing
gear doors and releasing the landing gear
handle to neutral should be between 3 and 9
seconds at room temperature. Colder temper-
atures will cause a longer delay.
i.
Shut down engine, or disconnect Hydro Test in
accordance with paragraph 5-126.

https://ibb.co/P9P0bQ9
__________________
337B
Philadelphia PA
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 10:31 AM.


Powered by vBulletin® Version 3.6.9
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.