Skymaster Forum  

Go Back   Skymaster Forum > Messages
Register FAQ Members List Calendar Today's Posts

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #2  
Unread 11-28-02, 09:26 AM
stackj stackj is offline
Registered User
 
Join Date: Apr 2002
Location: Richmond, VA
Posts: 311
stackj is an unknown quantity at this point
Send a message via AIM to stackj
Plesant Surprise

The facia over the switch sub-panel is reasonably flexible. I was able to do the job in less than two hours. That's less than 30 minutes per switch replaced (2 Boost pumps, Regulator selector and Run Stby).

Now if I can just find a Master Sw (S1159-1-1) and a Generator Sw (S1160-2-1) I might also get rid of the fluctuating voltage in the electrical system.
__________________
Jim Stack
Richmond, VA
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 10:04 PM.


Powered by vBulletin® Version 3.6.9
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.