Skymaster Forum  

Go Back   Skymaster Forum > Messages
Register FAQ Members List Calendar Today's Posts

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #12  
Unread 02-22-19, 12:20 AM
DrDave DrDave is offline
Registered User
 
Join Date: Nov 2010
Location: Seattle
Posts: 115
DrDave is on a distinguished road
Hi:

There is going to be an avionics master switch on the panel. It will go from a breaker on the main bus to the switch and then back to power the shorter avionics bus on the lower row of the panel. There are two separate buses on the bottom row. There is an empty breaker next to the avionics bus that will feed the avionics master switch and bus. BTW, that narrow jumper will carry 105 amps.

I do not recall the size of the lugs on the starter. I will look tomorrow and let you know. Do you have the crimp tool for the larger size lugs? As I recall that was a $350 investment in that crimper.

Dave
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 01:54 AM.


Powered by vBulletin® Version 3.6.9
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.