![]() |
|
Register | FAQ | Members List | Calendar | Today's Posts | Search |
|
Thread Tools | Rate Thread | Display Modes |
#2
|
|||
|
|||
Plesant Surprise
The facia over the switch sub-panel is reasonably flexible. I was able to do the job in less than two hours. That's less than 30 minutes per switch replaced (2 Boost pumps, Regulator selector and Run Stby).
Now if I can just find a Master Sw (S1159-1-1) and a Generator Sw (S1160-2-1) I might also get rid of the fluctuating voltage in the electrical system.
__________________
Jim Stack Richmond, VA |