![]() |
|
Register | FAQ | Members List | Calendar | Today's Posts | Search |
|
Thread Tools | Rate Thread | Display Modes |
#7
|
||||
|
||||
Attached is another way from service manual to purge air from system without placing on jacks.
5-128. BLEEDING TIME-DELAY VALVE. The Time-delay valve in the Power Pack may be purged of air by operating the engine-driven pump, or the Hydro Test may be used. 2. Make sure reservoir is full. b Start engine and let run at 1000 rpm, or connegt Hydro Test in accordance with paragraph 5-125 Place landing gear handle in the down position and hold for approximately one minute, while turning the master switch OFF until doors open, then ON un- til doors close. d. Repeat step "c" four times, waiting one minute between steps. e. Check that time-delay operates properly by mov- ing gear handle sharply to the down position and re- cording time as handle returns to neutral. NOTE The time delay between closing of the landing gear doors and releasing the landing gear handle to neutral should be between 3 and 9 seconds at room temperature. Colder temper- atures will cause a longer delay. i. Shut down engine, or disconnect Hydro Test in accordance with paragraph 5-126. https://ibb.co/P9P0bQ9
__________________
337B Philadelphia PA |